Rapid Condition Survey

District: 
Jumla

RAP3 DTA Jumla conducted a rapid condition survey of all DRCN roads in first and second week of November. The survey was done for the preparation of ARAMP and SMGs estimation. DTA has planned to implement SMGs on three DRCN roads (63DR007, 63DR008 and 63DR009). These are the same DRCNs where specific maintenance activities were conducted last year. RTL, GE, Intern Engineer, SAME and IOW were actively involved in the survey. Gabion wall, toe wall, dry stone wall and stone soiling were the main maintenance activities identified by the survey team.