2. LRN ROAD INVENTORY

Based on the findings of the Nepal Road Sector Assessment Study (NRSAS), DOLIDAR undertook its first Annual LRN Inventory Survey in 2012 assisted by the RTI Maintenance Pilot funded through RAP2. Subsequent publications of the document have been supported by RAP3 funding and TA. Till date DTMPs of 55 districts have been prepared/updated and the LRN Inventory also compiled on January 2015. A total of 52,883km of Rural Roads have been constructed till 2014. Of which, DRCN Roads is about 23,192km and Village Roads is 29,690km. Of the total DRCN Roads; blacktopped is 1161km (5%), gravelled 6229km (26.4%) and earthen surface is 15902km (68.6%). Likewise Village Roads consists; blacktopped 528.9km (1.8%), gravelled 6295.9km and earthen surface 22865.8km. Data reveals that a total of 7269km new DRCN roads need to be constructed to connect remaining 584 VDCs centres that have no road network access yet. Other details can be obtain from LRN Inventory 2015.